Goal L: Outdoor Lighting

Share Goal L: Outdoor Lighting on Facebook Share Goal L: Outdoor Lighting on Twitter Share Goal L: Outdoor Lighting on Linkedin Email Goal L: Outdoor Lighting link

The plan is currently being refined.

If you are viewing this website on a mobile device, please use full-screen mode (landscape).


Starry night

Preserve and protect dark skies as a key component of Oro Valley’s natural environment and community values.



Goal. The desired result or the envisioned future, answering the question “What do we strive for?”
Policy.The direction or path, answering the question “How are we achieving our goals?”
Action. The specific and measurable steps, answering the question
“What steps do we need to take to achieve our goals?”


Each action includes a timeframe for completion and assigns a responsible department within the Town of Oro Valley to lead its implementation. This information is meant to be somewhat flexible, as priorities for each action may shift based on new guidance and resources. More information about the anticipated timeframe is provided at the bottom of this page.

The following is a list of policies and actions that support the goal and long-term vision for the community.



Light fixture on a wall
Policy L.1. Promote outdoor lighting that ensures safety, minimizes impacts to adjacent properties, reduces excessive use of energy, preserves wildlife habitats, and enhances the enjoyment of the night sky.


green pinThe following actions will be implemented on an ongoing basis:Departments
124Continue to enforce the Town’s lighting code by performing periodic light inspections of all commercial centers

and working with residents to resolve lighting concerns.




CED
125Continue to maintain naturally dark environments in wildlife habitats, such as washes and natural open spaces.

CED
The following actions are anticipated to be completed in 1-2 years:Departments
126

Improve night sky visibility and maintain safety by updating the Town’s lighting code to:

  • Identify best practices and support regional efforts to minimize light pollution.
  • Address private sports field lighting design and levels.
  • Research and address emerging lighting technology.
  • Require the minimum amount of outdoor lighting while ensuring safety.
CED
The following actions are anticipated to be completed in 3-6 years:Departments
127Educate and explore opportunities to support property owners in converting light fixtures to more energy-efficient and dark sky compliant options.

CED
128Identify opportunities to implement energy saving and dark sky compliant lighting technology, designs, and operations at Town facilities, including:
  • Public parks, including sports fields
  • Public roads
  • High-use paved paths

Parks and Recreation, Public Works,
CED


Anticipated Timeframes for Completion:
  • Ongoing. Actions that are continually maintained.
  • Annual. Actions that are implemented on a yearly basis.
  • Short (1-2 years). Actions that have been started or require minimal resources.
  • Medium (3-6 years). Actions that require additional resources or time to complete.
  • Long (7-10 years). Actions that require additional guidance, time, and resources to complete.



The plan is currently being refined.

If you are viewing this website on a mobile device, please use full-screen mode (landscape).


Starry night

Preserve and protect dark skies as a key component of Oro Valley’s natural environment and community values.



Goal. The desired result or the envisioned future, answering the question “What do we strive for?”
Policy.The direction or path, answering the question “How are we achieving our goals?”
Action. The specific and measurable steps, answering the question
“What steps do we need to take to achieve our goals?”


Each action includes a timeframe for completion and assigns a responsible department within the Town of Oro Valley to lead its implementation. This information is meant to be somewhat flexible, as priorities for each action may shift based on new guidance and resources. More information about the anticipated timeframe is provided at the bottom of this page.

The following is a list of policies and actions that support the goal and long-term vision for the community.



Light fixture on a wall
Policy L.1. Promote outdoor lighting that ensures safety, minimizes impacts to adjacent properties, reduces excessive use of energy, preserves wildlife habitats, and enhances the enjoyment of the night sky.


green pinThe following actions will be implemented on an ongoing basis:Departments
124Continue to enforce the Town’s lighting code by performing periodic light inspections of all commercial centers

and working with residents to resolve lighting concerns.




CED
125Continue to maintain naturally dark environments in wildlife habitats, such as washes and natural open spaces.

CED
The following actions are anticipated to be completed in 1-2 years:Departments
126

Improve night sky visibility and maintain safety by updating the Town’s lighting code to:

  • Identify best practices and support regional efforts to minimize light pollution.
  • Address private sports field lighting design and levels.
  • Research and address emerging lighting technology.
  • Require the minimum amount of outdoor lighting while ensuring safety.
CED
The following actions are anticipated to be completed in 3-6 years:Departments
127Educate and explore opportunities to support property owners in converting light fixtures to more energy-efficient and dark sky compliant options.

CED
128Identify opportunities to implement energy saving and dark sky compliant lighting technology, designs, and operations at Town facilities, including:
  • Public parks, including sports fields
  • Public roads
  • High-use paved paths

Parks and Recreation, Public Works,
CED


Anticipated Timeframes for Completion:
  • Ongoing. Actions that are continually maintained.
  • Annual. Actions that are implemented on a yearly basis.
  • Short (1-2 years). Actions that have been started or require minimal resources.
  • Medium (3-6 years). Actions that require additional resources or time to complete.
  • Long (7-10 years). Actions that require additional guidance, time, and resources to complete.


Discussions: All (1) Open (1)
Page last updated: 08 Jan 2026, 10:34 AM