Goal GG: High-quality Design

Share Goal GG: High-quality Design on Facebook Share Goal GG: High-quality Design on Twitter Share Goal GG: High-quality Design on Linkedin Email Goal GG: High-quality Design link
Please read the information below then provide your comments at the bottom of this page by October 31, 2025.

If you are viewing this website on a mobile device, please use full-screen mode (landscape).


Steam Pump village self-storage building

Foster high-quality design that enhances Oro Valley’s unique, suburban character.



Goal. The desired result or the envisioned future, answering the question “What do we strive for?”
Policy.The direction or path, answering the question “How are we achieving our goals?”
Action. The specific and measurable steps, answering the question
“What steps do we need to take to achieve our goals?”


Each action includes a timeframe for completion and assigns a responsible department within the Town of Oro Valley to lead its implementation. This information is meant to be somewhat flexible, as priorities for each action may shift based on new guidance and resources. More information about the anticipated timeframe is provided at the bottom of this page.

The following is a list of policies and actions that support the goal and long-term vision for the community.



meggitt securaplane
Policy GG.1. Ensure compatibility, community character, and design are considered in all land use and policy decisions.


orange pinThe following actions will be implemented on an ongoing basis:Departments
267Update and enforce design standards that ensure compatibility with surrounding areas, blend with the natural environment, and protect mountain views.

Community and Economic Development (CED)
268Review and possibly update the Crime Prevention through Environmental Design (CPTED) Principles.

CED
269Require signs to be appropriate in scale, time of use, and illumination to ensure compatibility with the character and architecture of the adjacent area.CED
The following actions are anticipated to be completed in 1-2 years:Departments
270Expand and update the Town’s design standards to include requirements for a variety of housing types, such as site-delivered homes, townhomes, patio homes, and duplexes.CED


Redeveloped building on Oracle and Magee
Policy GG.2. Ensure redevelopment is consistent with Oro Valley’s character and integrated with the existing site and adjacent areas.


The following actions will be implemented on an ongoing basis:Departments
271

Require cohesive developments by:

  • Providing adequate buffers and screening
  • Mitigating noise and odors
  • Modernizing lighting to conserve the night sky while maintaining safety
  • Enhancing pedestrian and cyclist connectivity
CED
272Work with property owners to update their commercial center’s Master Sign Programs to incorporate new lighting technology, styles, colors, and designs.CED


Anticipated Timeframes for Completion:
  • Ongoing. Actions that are continually maintained.
  • Annual. Actions that are implemented on a yearly basis.
  • Short (1-2 years). Actions that have been started or require minimal resources.
  • Medium (3-6 years). Actions that require additional resources or time to complete.
  • Long (7-10 years). Actions that require additional guidance, time, and resources to complete.


Please read the information below then provide your comments at the bottom of this page by October 31, 2025.

If you are viewing this website on a mobile device, please use full-screen mode (landscape).


Steam Pump village self-storage building

Foster high-quality design that enhances Oro Valley’s unique, suburban character.



Goal. The desired result or the envisioned future, answering the question “What do we strive for?”
Policy.The direction or path, answering the question “How are we achieving our goals?”
Action. The specific and measurable steps, answering the question
“What steps do we need to take to achieve our goals?”


Each action includes a timeframe for completion and assigns a responsible department within the Town of Oro Valley to lead its implementation. This information is meant to be somewhat flexible, as priorities for each action may shift based on new guidance and resources. More information about the anticipated timeframe is provided at the bottom of this page.

The following is a list of policies and actions that support the goal and long-term vision for the community.



meggitt securaplane
Policy GG.1. Ensure compatibility, community character, and design are considered in all land use and policy decisions.


orange pinThe following actions will be implemented on an ongoing basis:Departments
267Update and enforce design standards that ensure compatibility with surrounding areas, blend with the natural environment, and protect mountain views.

Community and Economic Development (CED)
268Review and possibly update the Crime Prevention through Environmental Design (CPTED) Principles.

CED
269Require signs to be appropriate in scale, time of use, and illumination to ensure compatibility with the character and architecture of the adjacent area.CED
The following actions are anticipated to be completed in 1-2 years:Departments
270Expand and update the Town’s design standards to include requirements for a variety of housing types, such as site-delivered homes, townhomes, patio homes, and duplexes.CED


Redeveloped building on Oracle and Magee
Policy GG.2. Ensure redevelopment is consistent with Oro Valley’s character and integrated with the existing site and adjacent areas.


The following actions will be implemented on an ongoing basis:Departments
271

Require cohesive developments by:

  • Providing adequate buffers and screening
  • Mitigating noise and odors
  • Modernizing lighting to conserve the night sky while maintaining safety
  • Enhancing pedestrian and cyclist connectivity
CED
272Work with property owners to update their commercial center’s Master Sign Programs to incorporate new lighting technology, styles, colors, and designs.CED


Anticipated Timeframes for Completion:
  • Ongoing. Actions that are continually maintained.
  • Annual. Actions that are implemented on a yearly basis.
  • Short (1-2 years). Actions that have been started or require minimal resources.
  • Medium (3-6 years). Actions that require additional resources or time to complete.
  • Long (7-10 years). Actions that require additional guidance, time, and resources to complete.


Discussions: All (1) Open (1)
  • Please provide your questions or comments about the information on this page below.

    11 days ago
    Share Please provide your questions or comments about the information on this page below. on Facebook Share Please provide your questions or comments about the information on this page below. on Twitter Share Please provide your questions or comments about the information on this page below. on Linkedin Email Please provide your questions or comments about the information on this page below. link
    Reply notification settings
    loader image
    Didn't receive confirmation?
    Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
    Submitting your comment
    Cancel
Page last updated: 25 Sep 2025, 01:01 PM